Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 79905 REL 10: 1992-026-01 EXP MIDDLE FLY CREEK HELICOPTER - GRMW
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
79905 REL 10
Contract Title:
1992-026-01 EXP MIDDLE FLY CREEK HELICOPTER - GRMW
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The Middle Fly portion of this project involves implementing restoration in Middle Fly Creek to improve habitat for listed spring/summer chinook and summer steelhead. The project is located in the Lower Fly Creek Subwatershed (170601040108(T 5S, R 35.5E, S 3, 4, 8, 9)). Currently, the stream channel is simplified with low levels of large wood, course substrate, and lack of quality pool habitat. Floodplain inundation and function is limited. The project would construct debris jams and habitat structures at 56 sites within the middle 3.0 miles of Fly Creek (RM 4.0 – RM 7.0). Approximately, 2400 trees and tops will be flown in and placed by helicopter. There will be 100 trees directionally felled by hand and 85% of the racking material will be incorporated into the structure and stream through hand placement.

Project partners are United States Forest Service, Grande Ronde Model Watershed and Bonneville Power Administration.

Overall Goal: To achieve proper ecological form and function of Middle Fly Creek and thereby restore habitat for  the imperiled Snake River Basin Spring/Summer Chinook and Snake River Basin Steelhead.

Subgoal 1: Physical - Restore Hydrologic Function
Increase hydration of a laterally confined channel to improve groundwater retention through channel spanning log jam construction.

Subgoal 2: Physical - Activate Side Channel Scrolls
Encourage and create perennial side channels through channel spanning log jam construction.

Subgoal 3: Biological - Improve Fish Habitat
Restore habitat complexity. Existing LWD structures will be modified and additional whole trees will be placed.  These structures will encourage scour pool habitat, and fish cover.

This contract portion will only cover the helicopter portion of the project.  We split the project into two parts, due to increased overhead costs within the USFS.
Account Type(s):
Expense
Contract Start Date:
04/01/2021
Contract End Date:
12/31/2022
Current Contract Value:
$820,915
Expenditures:
$820,915

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Thomas Delorenzo Bonneville Power Administration Yes Env. Compliance Lead tdelorenzo@bpa.gov (503) 230-4419
Mary Estes Grande Ronde Model Watershed Foundation Yes Administrative Contact mary@grmw.org (541) 663-0570
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Joe Platz US Department of Agriculture (USDA) Yes Contract Manager joe.platz@usda.gov (541) 962-8571
Jesse Steele Grande Ronde Model Watershed Foundation Yes Supervisor jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Alexandra Towne Grande Ronde Model Watershed Foundation No Interested Party alex@grmw.org (541) 663-0570
Sean Welch Bonneville Power Administration Yes F&W Approver spwelch@bpa.gov (503) 230-7691
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance completed. A: 165. Environmental Compliance 02/24/2022 02/24/2022
Large Wood Structure Construction/Placement B: 29. Middle Fly Large Wood Placement via helicopter 02/25/2022 03/25/2022
Effective implementation management and timely contract administration C: 119. Project/Contract Administration 01/17/2022 03/17/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance
B 29 Middle Fly Large Wood Placement via helicopter 08/23/2021
C 119 Project/Contract Administration
D 132 Completion Report
E 185 Periodic Status Reports for BPA